Right of Way (ROW) Challenge in Construction of Transmission Lines & its Mitigation in India

2023-04-13 17:06:06 By : Mr. Xiangbing Ye

At COP26 summit in Glasgow in Nov’2021, India has pledged 500 GW of non-fossil fuel based installed capacity by the year 2030 and agreed to meet 50% of its energy requirement by renewable sources.

Since e-waste regulation bans landfilling, recycling is the only option Three Phase Circuit Breaker

Right of Way (ROW) Challenge in Construction of Transmission Lines & its Mitigation in India

Our Company is working on both EPC business as well as in green energy initiatives

Our vision for the company is to be a brand to contend with in the EV two-wheeler segment

Our innovation strategy is advancing our commitment to cleaner, lower-carbon technology

Right of Way (ROW) Challenge in Construction of Transmission Lines & its Mitigation in India

High Voltage Current Transformer For the upcoming 15th Edition, Elecrama 2023, we have more than 1,500 exhibitors